The macadam era | Oakland Geology

Oakland used to brag about the quality of its streets, which were made of Oakland rock. Two things, an accident of geology and technological happenstance, meant our first roads were built starting around 1860 with macadam paving, the pre-asphalt method of constructing roadways with layers of clean, sterile crushed rock, each layer wetted down and compacted under heavy rollers.