FERC approved Southwest Power Pool tariff revisions on 19 August 2026 allowing software-driven grid reconfiguration, with savings estimated at 18mto18m to 44m.

The post FERC approves SPP plan to use topology optimization software against grid congestion first appeared on Winssolutions .