With the increasing penetration of distributed renewable generation and flexible loads, topology adjustment has been used as a proactive risk-mitigation measure. However, loop-closing operations can readily lead to steady-state overloads and bus-voltage limit violations. To address these issues, an active distribution network reconfiguration method is proposed that accounts for security requirements and source–load uncertainty. First, a probabilistic model considering the correlations among wind
Active reconfiguration for distribution networks considering safety and source load uncertainty
Hongmei Li
