HS2 has agreed to introduce further mitigation measures to stop a foul odour emanating from a construction site in North Warwickshire that is being exacerbated by the recent heat. The post HS2 agrees to mitigate ‘foul odour’ from construction site exacerbated by heat appeared first on New Civil Engineer .