Base position sequence planning for construction robots using bilevel cost optimization
Purpose This paper aims to introduce an integrated planning method for the base position (BP) selection and its optimal visiting sequence for mobile manipulators executing large-scale construction tasks. The method ensures the overall optimality of the planning results through a bilevel coupled optimization of navigation cost and manipulation cost. Design/methodology/approach A two-stage methodology is proposed. First, candidate BP clusters are generated by explicitly incorporating construction
